Onsite Pre-work

With just 7 weeks to demolish the existing precipitator and replace it with a fully functioning state of the art baghouse, time became a precious commodity.

The pictures on this page depict the pre-work phase of the project. With all of the baghouse parts having been fabricated at Goodhart Sons, Inc shops in Lancaster, PA. the next step was to have them shipped to the job site.

During the final phases of fabrication, the Traffic Department began sorting out the logistics of getting the parts to the job site. This included securing the necessary permits, arranging haulers of various sizes and selecting a route. Once the parts were received on site they were inventoried, sorted and inspected for damage during shipping.

The Goodhart Sons, Inc. Installation team moved in and began to build the major baghouse sub-assemblies on-site, in a parking lot, prior to the outage.

These sub-assemblies also included a new hopper frame that weighed approximately 80,000 pounds along with the baghouse sub-assemblies with each section weighing in at over 100,000 pounds each.

Heavy Haulers were brought to the site for transporting the sub assemblies to the staging area. Multiple cranes were required for the entire duration of the project.

On site pre-work

With just 7 weeks to demolish the existing precipitator and replace it with a fully functioning state of the art baghouse, time was a precious commodity . . .

Get a behind the scenes look with this video of the work in progress including pre-work, demolition of the original precipitator and the installation of the new baghouse . . .

The outage

Case Study: An Electrostatic Precipitator  To Baghouse Conversion Project

Shop fabrication

With more than 170,000 square feet of manufacturing space, modern equipment, and an experienced team of steel fabricators, the craftsmen of Goodhart Sons, Inc. were able to . . .