Installation of a spray dryer and support structure

Spray Dryer Expansion Project

Goodhart Sons, Inc. was contracted by an equipment supply company to perform the fabrication, freight and installation of a structural steel tower for a 40 foot diameter spray dryer and auxiliary equipment.

The project consisted of the fabrication and installation of approximately 410,000 lbs. of steelwork. While we are no stranger to working on large structural steel projects, this was the first major project to utilize our new beam drilling line that was installed in December of 2011.

See more from this project  Download as a PDF

  

 

Fabrication & Installation of Stainless Steel Silos

Goodhart Sons, Inc. was recently contracted by a food manufacturing company to perform the design, fabrication and installation of six (6) rectangular stainless steel silos including the removal of the existing silos. The fabrication consisted of the six Stainless Steel silos being polished to the customer specifications and delivery to the job site in Lancaster, PA. The Installation consisted of the mechanical and electrical removal of the existing silos, including electrical connection, during a six-day shutdown period.

See more from this project  Download as a PDF

 

 

VAM Emissions Control Abatement System

Goodhart Sons Inc was contracted by a pollution control equipment company to perform the detailing, fabrication, freight and installation of the VAM Emission  Control Abatement System. The project consisted of the fabrication and installation of structural steel, equipment , ductwork, exhaust stacks,  platforms, and piping of the entire system including pyroblock of the pollution control equipment. There were 40 tractor trailer loads of fabricated items transported to the job site located in Cameron, West Virginia.

See more from this project Download as a PDF

Structural Steel Tower & Jacketed Vessels

Goodhart Sons, Inc. was contracted by a newly-formed formed Molybdenum recycling  company to perform the  design, fabrication, freight, and installation of the structural steel tower and a series of water-cooled jacketed vessels that will serve as the showpiece and heart of this plant.  GSI went on to receive the complete balance of plant installation contract, the air pollution control installation contract as well as miscellaneous fabrication contracts for additional bins and tanks.   The jobsite is located in Atoka, Oklahoma.

See more from this project Download as a PDF

Bonding Line Installation Project

Goodhart Sons, Inc. was contracted by a laminate flooring manufacturer to perform a turnkey installation of a new bonding line and dust collection system. Goodhart Sons, Inc. was responsible for the overall project management of the entire project. The detailing and fabrication consisted of a dust collection system, structural steel supports, and access platforms. The mechanical installation consisted of the new bonding line equipment, ductwork, steelwork, and equipment for the dust collection system including civil work, electrical, piping, and insulation.

See more from this project  Download as a PDF